Light Rail System Between F.Altay and Narlıdere Districts

Tendered by Izmir Metropolitan Municipality, Fahrettin Altay – Narlidere light rail system is 7.2 km long and includes 7 stations. In 2023, it is estimated that the line will carry 290.000 passengers daily.

Within the scope of the project, Prota’s services include;

  • Track-way Alignment Engineering and Railway Design
  • Architectural and Finishing Works Design
  • Structural, Geotechnical and Tunnel Design
  • Electrical and Electromechanical System Design
  • Mechanical Engineering Design
  • Fire Safety Engineering and Control System Design
  • Acoustic and Vibration Design
  • Traffic Plan and Landscape Design
  • Preparation of Cost Estimates, Bills of Quantities and Tender Documents

Details

  • Location İzmir, Turkey
  • Clientİzmir Metropolitan Municipality
  • Total Length 7.2 km
  • Term Of Contract 2016 - 2018