Tunnel Excavation of Prota Designed Atakoy - Ikitelli Metro Line Has Been Completed

Tunnel excavation of Prota designed Atakoy – Ikitelli metro line has been completed. The metro line is scheduled to be in operation during 2021.

Atakoy – Ikitelli metro line will carry more than 412,000 passengers daily. Integrated with Marmaray, the metro line will be 13,5 km long with 11 stations. Projects prepared by Prota engineers and architects on a BIM environment were nominated to Autodesk’s AEC Excellence Awards finals in Infrastructure category.