Prota has undertaken the civil, architectural and structural design of the Natural Gas CCPP

Prota completed its architectural and structural design services for the 950 MW Combined Cycle Power Plant located in Kirikkale, Turkey.

Covering more than 227.000 square meters, the project consists of two gas turbines and one steam turbine with an estimated installed capacity of 950 MW.

Prota’s scope of works determined in the contract signed between Samsung C&T Corporation included;

  • Getting construction permit
  • Site preparation design
  • Civil, structural and architectural design
  • Preparation off  cost estimates, bills of quantities and tender documents

Details

  • LocationKirikkale/Turkey
  • ClientSamsung C&T Corporation
  • Capacity950 MW
  • Term of Contract2013 - 2017